Products:Mooring Chain
Location:Zhenjiang
Duration:5months
Work Responsibility:
Documents Review;
Raw Material Verification (Bar Stocks and Studs);
Common Links’ Production and Short
Chains Connection monitor, Pre- NDT
(MT & UT) Verification;
Heat Treatment (Quench + Temper) Monitor;
Proof Load Test Verification;
Stud Expansion Verification;
Shot Blasting Verification;
Final Inspection (Final MPI &UT, Final Visual
Inspection) Verification;
Quintuplets/Triplets Testing;
Packing / Marking/Storage Verification.
Applied standard:TODDI
Specification (R4);
Offshore Standard DNV-OS-E302;
ASTM E164-08 Ultrasonic Contact
Examination of weldments;
ASTM E587-10 Ultrasonic Angle-Beam Examination by the
Contact Method;
ASTM E709-08 Standard Guide of Magnetic Particle
Examination;
ASTM E1444-05 Standard Practice of Magnetic Particle
Examination
|