Business: Resident Supervision
Project Name: Guara/Lula NE-QWHI Project
Product Name: Buoys and Foundations
Codes and Standards:
ITP and Drawings
AWS D1.1
Inspection Activities:
Welding responsibility:
Track raw material;
Carried out the daily inspection and monitored the cutting, fit-up and welding;
Performed the VT or final visual inspection for the panels of buoys and foundations
Reviewed the reports of visual and fit-up issued by manufacturers
Issued daily inspection report to the supervisor
Coating responsibility:
Review the inspection and testing program of contractors.
Review all the relevant coating specification of the project.
Check the welding defects which may be lead to the coating quality defection
Execute the inspection to ensure the ambience condition and the metal surface condition are good enough before blasting and painting application
Make sure the DFT and quality of primer, intermediate coat, and top coat reaches the project requirement during the block stage & assembly stage & delivery stage.
Execute Salt test, adhesion test and etc. according to the project ITP & CTF or the owner’s requirements.
Cooperate with the project director to issue or close out of Non Conformance Reports to make sure the coating quality meets the required standard and specifications.
|